您的位置:首页-> 简历吧-> 英文简历-> 电子工程师个人简历模板

本类排行TOP10

·英文求职信之秘笈大公开
·英文简历(办公室文员)GENERAL OFFICE CLERK
·英文简历(生产经理)PRODUCTION MANAGER
·英文简历(行政助理)ADMINISTRATIVE ASSISTANT
·英文简历(市场助理)MARKETING ASSISTANT
·英文简历(市场主管)MARKETING AND SALES DIRECTOR
·英文简历(人事助理)ASSISTANT PERSONNEL OFFICER
·英文简历(管理员)CONTROLLER(General)
·英文简历(销售助理)SALES ASSISTANT
·英文简历(会计师)ACCOUNTANT(General)

便民工具
电子工程师个人简历模板

2007-5-7 23:04:07
 
 
ELECTRONICS ENGINEER(Experienced)
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.

BACKGROUND SUMMARY
Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.

PROFESSIONAL WORK EXPERIENCE
Stevenson Data Systems,Los Angeles,CA 1981-1993
Components Evaluation Engineer 1992-1993
Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.

Design Evaluation Engineer 1990-1992
Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.

Assistant Engineer 1981-1990
Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.

EDUCATION
Bachelor of Science in Electrical Engineering
--University of Southern California 1990
Associate in Engineering Electronics
--University of Southern California 1981


Job descriptions emphasize candidate's accomploshments. Work history is stated in reverse chronological order,with most recent employment listed first.

 
本站依法保护知识产权,倡导网络文化,本站部分内容来自网络,如果我们的文章涉及或侵犯您的有关权益,请即时与我们联系,请注明网址及文章,我们会及时处理或删除,感谢您的合作!